- Thread starter
- #541
Yeah this sucks.
That light cable, builders broke, sparky fixed twice. He came back because it was off again this morning, actually it was about 20%, pushed together. Inwas going to need to go out so went to show & Co where the problem was and pushed the cable connector (like a semi waterproof 240v clip and twist) puff of smoke out of it.
I stayed for Sparky. I realised what the builders were telling me - I think I actually knew this because I think I only told & Co “what a f&£@ )£?$) wow Teddy is quick with the censorship
Builder’s guy didn’t realise it was untwist the blue collar and pull apart. So he had unscrewed the ends.
I mean my Sparky could have been more thorough but he didn’t think anyone would be so stupid to do that. Even in other countries people might miss that. I actually knew that but had not relayed it.
He opened it and it would have failed. Not immediately. Like in a week minimum or so I reckon. It sits on steel with a smoke detector at 8am so we’d be around.
We don’t even need it. We build another offsite room which is a maybe then those connectors are gone. No drivers in the tent anyway. We’ll change them to permanent connectors.
Builders for building and electricians for electrical. Plumbers meh as long as it doesn’t smell I’ll do that.
Safety always.
Co2 all changed up. I changed to 3 feeds in the flower room, drilled the hole myself and everything
Dropping some on the shorties.
Reg should have been fixed.
Tomorrow I’m running new drainage for the dehumidifier into the same drainage as the drip tray waste pipes. All by myself too. My joys of a bit of blue PVC pip, some glue and a cutter are previously documented.
Nick & Co
That light cable, builders broke, sparky fixed twice. He came back because it was off again this morning, actually it was about 20%, pushed together. Inwas going to need to go out so went to show & Co where the problem was and pushed the cable connector (like a semi waterproof 240v clip and twist) puff of smoke out of it.
I stayed for Sparky. I realised what the builders were telling me - I think I actually knew this because I think I only told & Co “what a f&£@ )£?$) wow Teddy is quick with the censorship
Builder’s guy didn’t realise it was untwist the blue collar and pull apart. So he had unscrewed the ends.
I mean my Sparky could have been more thorough but he didn’t think anyone would be so stupid to do that. Even in other countries people might miss that. I actually knew that but had not relayed it.
He opened it and it would have failed. Not immediately. Like in a week minimum or so I reckon. It sits on steel with a smoke detector at 8am so we’d be around.
We don’t even need it. We build another offsite room which is a maybe then those connectors are gone. No drivers in the tent anyway. We’ll change them to permanent connectors.
Builders for building and electricians for electrical. Plumbers meh as long as it doesn’t smell I’ll do that.
Safety always.
Co2 all changed up. I changed to 3 feeds in the flower room, drilled the hole myself and everything
Dropping some on the shorties.
Reg should have been fixed.
Tomorrow I’m running new drainage for the dehumidifier into the same drainage as the drip tray waste pipes. All by myself too. My joys of a bit of blue PVC pip, some glue and a cutter are previously documented.
Nick & Co