What the HELL man, that's disgusting, I could of done with out that. How ever most people go to the Hospital and get Anti-Venom and nothing like that happens. Man that's some sick shit. Any way I have been up prepping the hill and as you know I eliminated the 6 plant area and turned it into a 2 plant area. The first hole was a piece of cake. The second hole how ever was a different story. After 3 days, putting in 1 hour 3 times a day this is how much I got done.
I've been using this 35 lb steel bar to break up the dirt.
I hauled it down to the garage and used my Die Grinder to sharpen both ends.
Now if you look where I put the white wire, that is the head of a gigantic bolder and its different then the igneous rock that's normally in this soil. It barely chips. Sharpening the bar did absolutely nothing.
I through that bar at that rock as long as I could, then said Fuck This.
I broke up the surrounding dirt and filled it back in.
That took about 2 1/2 hours. Now just 30 holes to go. I must be getting old, cause I would have had all this crap done by April 1st any other year. I SUCK. TOAST