So I had this idea on how to add 2 more 1kw lites on my existing 5.0 mover. With about 6' of Unistrut and about 10' of 1/2" all-thread and a bunch of nuts and washers, this is what I came up with.....
I bolted the unistrut on top of the mover arm with a 1/4-20 bolt and ran the all-thread thru the light hangers...
here you can see how I used the nuts and washers to lock the all-thread to the light hangers and rope ratchet. By adjusting the point where the rope ratchet connects to the all-thread, I was able to achieve balance of the light assembly..
and just a final pic with the ducting connected..
I bolted the unistrut on top of the mover arm with a 1/4-20 bolt and ran the all-thread thru the light hangers...
here you can see how I used the nuts and washers to lock the all-thread to the light hangers and rope ratchet. By adjusting the point where the rope ratchet connects to the all-thread, I was able to achieve balance of the light assembly..
and just a final pic with the ducting connected..